Customization: | Available |
---|---|
Voltage: | 110kV |
Generating Methods: | Hydroelectric Power Generation |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The leading products include various types of turbine runners and flow-through components, as well as blast compressor impellers, etc., and contracted the numerical control (CNC) machining business of forging castings. At present, the total number of employees in the company includes about 50 people in various departments such as product design, technical quality service and manufacturing
Adhering to the 16-character business philosophy of careful design, quality first, service first, integrity-based, the company wholeheartedly provides satisfactory products and services for customers at home and abroad, achieves win-win cooperation, and works together to create a better future for enterprises.
Partial performance of mixed flow runner
Customer Name |
Turbine model |
Power station location |
Scope of supply |
Shenyang Haoyue Power Station Equipment Co., Ltd |
HLYL106B-LJ-185 |
Yunnan | Runner |
Hulutou Hydropower Station |
HLTJ020-LJ-175 |
Shaanxi | Runner |
Daheishan Hydropower Station |
HLA920-LJ-160 |
Yunnan | Runner and water guide mechanism |
Longdong Hydropower Station |
HLTJ48B-LJ-125 |
Sichuan | Runner |
Shenyang Haoyue Power Station Equipment Co., Ltd |
HLYL41-LJ-107 |
Yunnan | Runner |
Shenyang Haoyue Power Station Equipment Co., Ltd |
HLYL26B-WJ-105 |
Sichuan | Runner |
Dongfang Electric Group International Cooperation Co., Ltd |
HLTH011-LJ-100 |
New Guinea | Runner |
Jiduhe Hydropower Station |
HLTJ079-WJ-100 |
Yunnan | Runner |
Futeng Hydropower Station |
HLA550-WJ-95 |
Yunnan | Runner |
Hongshi Hydropower Station |
HLTJ90-WJ-71 |
Jilin | Runner |
Hongya Qingjiang Hydropower Equipment Co., Ltd |
HLNTJ066-WJ-60(Pumped-storage) |
Yunnan | Runner and water guide mechanism |
Partial Performance of Impact Wheel
Customer Name | Turbine model | Waterhead(m) | Output(kW) |
Leshan Juyi Electromechanical Equipment Engineering Company | CJA475-L-200/4x19.3 | 354.6 | 26907 |
Leshan Juyi Electromechanical Equipment Engineering Company | CJA475-L-170/4x11.7 | 640 | 24152 |
** River cascade II power station in Yingjiang, Yunnan | CJ1085-L-160/4×11 | 556.5 | 18000 |
Yunnan Yingjiang Gunpengyang Secondary Power Station | CJ1085-L-150/4×14 | 342.5 | 13750 |
Yunnan Tengchong Dachahe Hydropower Development Company | CJ1085-L-145/4×14.5 | 320 | 13000 |
Fujian Ningde Qianping Power Station | CJ1085-W-140/2×13 | 302.4 | 5000 |
Yunnan Gongshan Langgeluo River Power Station | CJ1085-W-140/2×11.8 | 420 | 6300 |
Yunnan Nujiang Jiduluo First Class | CJ1085-L-140/4×11 | 415 | 10000 |
Datian River in Jingdong, Yunnan | CJ1085-W-135/2×13.5 | 379 | 6300 |
Yunnan Nujiang Mukeji Power Station | CJ1085-W-135/2×9 | 640 | 7000 |
Yunnan Sirun Technology | CJA475-W-135/2×12 | 410 | 6300 |
Tianjin Tianfa Tianzhong Electric Power Equipment Manufacturing Co., Ltd | CJA475-W-127/2×8.2 | 615 | 5000 |
Yunnan Yingjiang Gunpengyang First Class Power Station | CJ1085-L-125/4×12 | 340.5 | 10000 |
Fujian Ningde Sanjianxi Power Station | CJ1085-W-125/2×9.5 | 578 | 6500 |